I am working at the office, as I do most Saturdays; but, no billable hours today. I arrived to ceiling panels on the floor, due to a leaky roof. Am waiting the roofer now. It's always something, isn't it? Anyway, in the meantime, I am copying data and files from the Tap 11 to the new 8.1 inch Lenovo Tablet 8. Once all the data and files are over there, I can reinstall my productivity software, and use the smaller tablet as the brain for my system. I have ordered a couple of docking stations for home and the office, and will hopefully reduce connect time to one cable in the future. I will report back. In the meantime, may the sun be at your back, and the rain stay away from your ceiling.
Comments